Gatwick Airport North Terminal Landside Redevelopment, NTLR

North Terminal Landside is a programme that has brought together 4 previously separate interdependent projects:

Gatwick Airport North Terminal Landside Redevelopment
Click to view large Version
Gatwick Airport North Terminal Landside Redevelopment
Click to view large Version
Gatwick Airport North Terminal Landside Redevelopment
Click to view large Version
Gatwick Airport North Terminal Landside Redevelopment
Click to view large Version

Scope of project:

  • North Terminal Forecourt comprises the construction of a new forecourt on Northways (between MSCP 5 and Soffitel Hotel) and Furlong Way (adjacent to Jubilee House) in response to ASIAD security requirements
  • North Terminal Interchange involves the construction of a new passenger interchange incorporating the existing North terminal ITTS station and MSCP’s 5 and 6 Customer Interface Areas to provide a direct route to and from the terminal at all levels.  This is a critical early part of project to coincide with reporting of ITTS.  Works start in June 2009 and should be completed by April 2010.
  • Multi storey Car Park 6 is the construction of a new short stay MSCP 6 to provide approximately 1200 new spaces.  The project is due to start on site in March 2010 and be completed by March 2011
  • North Terminal Extension is an extension both the south and east of the existing North Terminal to provide additional check in and baggage reclaim capacity.  The project starts on site in October 2009 and should be completed in September 2011.

Value:

£133million

Our Role:

Commercial leader for the programme as well as full cost management services on NTF, NTI and MSCP 6

<< Back to Case Studies

Edinburgh Airport Departure Lounge Extension, BAA

Scope of project:

  • 4,250m2 new build extension at first floor level to existing departure lounge
  • 7,500m2 of refurbishment and reconfiguration of existing retail and search facilities.
  • Works are airside and carried out in and adjacent to live terminal areas.
  • 24 month construction period with phased handover.
  • Complete January 2011.
Edinburgh Airport Departure Lounge Extension, BAA
Click to view large Version

Value:

£41 million

Our Role:

Full Cost Management Service
Fee Management of consultants and suppliers

<< Back to Case Studies

Edinburgh Airport Control Tower, BAA

Scope of project:

  • Control Tower, workshops, support offices and external works
  • IT infrastructure links to allow relocation of Air Traffic Control operations at Edinburgh Airport.
Control Tower
Click to view large Version

Value:

£10 million

Our Role:

Full Commercial and Cost Managers
Professional Fee Management

<< Back to Case Studies

Heathrow Airport East Terminal, BAA

Scope of project:

  • International Terminal replacing Terminal 1 and 2 at Heathrow.
  • Phase 1 is due to be completed by the Olympics in 2012.
  • Phase 1 is a terminal building of 161,000m2 serving 19 million passengers.
  • Associated forecourt works, stand works and pedestrian access works.
  • Initial works require the demolition of Terminal 2 and creation of substructure taking due consideration of the close proximity of the Piccadilly Underground Tunnel.
  • Significant challenges including how to access the site and how to ensure a workforce peaking at several thousand travels safely to site in the middle of the busiest International Airport in the world.
Heathrow Airport East Terminal, BAAClick to view large Version

Value:

£1.29 billion

Our Role:

Provide Strategic Commercial Advice from the Inception of the Project to Concept Design.

<< Back to Case Studies

Heathrow Airport – Multi Storey Car Park West, BAA

Scope of project:

  • The construction of a 55,000m2, six storey car park surrounded by some of Europe’s busiest roads.
  • With some 2100mm diameter, 53m long, piling in extremely close proximity to live railway tunnels and a 52m single span prefabricated Linkbridge installed over live roads, it represented one of the most complex challenges ever faced at the Airport.
Heathrow Airport MSCP Click to view large Version

Value:

£55 million

Our Role:

Full commercial service from the initial feasibility stages through to construction on site.

<< Back to Case Studies

Skyhub, BAA Glasgow

Scope of project:

  • Major extension to main terminal building at Glasgow Airport to provide new central search facility at first floor
  • Associated security installations, new retail and ancillary accommodation.
  • Refurbishment of existing main terminal building to provide common passenger lounge with associated retail and catering facilities.
  • Alterations to forecourt and new landscaping.
Skyhub, BAA GlasgowClick to view large Version

Click to view large Version

Value:

£30.1 million

Our Role:

Full Commercial and Cost Managers
Strategic risk management